Skip to content
7979.org.my
  • HomeExpand
    • 7979全人关怀站 7979 Holistic Care Station
    • 每月数据 ​ Monthly Statistics
    • 关于我们 About Us
  • 7979服务方案 Ministry ProgramExpand
    • 急难家庭救助 Family Crisis Intervention AssistanceExpand
      • 您转化社区的伙伴
      • 让爱走动的故事 A Story Of Love In Action-CIF
    • 弱势儿童陪读 Underprivileged Children Companionship ClassExpand
      • 让爱走动的故事 A Story Of Love In Action-UPC
    • 重大灾难回应 Major Disaster ResponseExpand
      • 尼泊尔洪灾 Nepal Flood
      • 儿童防减灾活动回顾 Children Disaster Preparedness & Mitigation Programme Flashback
      • 让爱走动的故事 A Story Of Love In Action-DRP
    • 吗哪食物银行 Manna Food BankExpand
      • 让爱走动的故事 A Story of Love in Action–MFB
    • 社区紧急援助 Community Emergency Relief
  • 7979 E-杂志 MagazineExpand
    • September 2026
    • July 2026
    • May 2026
    • March 2026
  • 即时消息 UpdatesExpand
    • 活动快讯 Events News
    • 时事议题 Current Issues
    • 媒体报道 Media Coverage
    • 活动专区 EventsExpand
      • 7979救助挑战营2025
  • 您的参与 ParticipationExpand
    • 购得希望 2026
    • 陪读天使
Donate 捐助
7979.org.my
  • 中文
  • English

从现场评估到安置行动,回应仍在继续

12 September, 2026


7979重大灾难回应顾问丘忠瑶(Eddy Hew)已经进入尼泊尔 Bidur 灾区,并与当地伙伴 MCDS 团队 一同进行现场评估及灾害回应。

🚧 一些受灾地点目前仍无法进入
目前,Bidur 是陆路能够抵达、较接近灾区内部的前线区域。更偏远的社区仍受到道路及桥梁损毁影响,部分地点需要依靠空中运输才能进入。

🏕️ 救援工作逐步进入临时安置阶段
目前约450名生还者暂住在 Shree Chandra Jyoti 中学。因学校即将恢复正常运作,他们需要另寻临时安置地点。 
经过协调,Bidur 市长已批准在学校旁的足球场设立临时帐篷营地,首阶段将尝试设置25顶帐篷。 MCDS也与联合国人口基金(UNFPA) 合作,为营地内的妇女与儿童提供医疗及心理援助。

👕 MCDS持续进行家庭援助
截至9月10日,MCDS已经向 150户家庭 提供衣物援助,优先帮助失去大部分财产、生活较困难的家庭。同时,团队也正在评估家庭煮食设备的需要,初步估计约需 450个瓦斯炉,实际数量将根据现场情况进一步确认。

🙏 灾后需要仍在改变
随着灾害回应持续推进,受灾家庭的需要也从紧急救援,逐渐延伸至临时住宿、家庭煮食、儿童教育及生计恢复等方面。
7979将继续与MCDS及当地伙伴同行,根据现场实际情况逐步回应灾区的需要。

🙏 也请继续为尼泊尔祷告:
* 为仍无法回家的受灾家庭和临时安置工作祷告;
* 为仍未能进入的偏远社区祷告,求道路及交通逐步恢复;
* 为灾区后续生活及重建工作祷告 ;
* 为MCDS、Eddy及前线伙伴祷告,求神赐下智慧与力量,并保守他们的安全与体力。

全人关怀团队
7979重大灾难回应处 
2026.09.12

注:部分灾区数据及需求为现场初步评估,实际数字及安排将随着MCDS及当地单位进一步核实而更新。


From Field Assessment to Temporary Shelter

12 September, 2026

7979 Major Disaster Response Advisor, Eddy Hew, is now in Bidur, Nepal, working with local partner MCDS on field assessments and disaster response.

🚧 Some affected areas remain inaccessible
Bidur is currently one of the closest frontline areas reachable by road. More remote communities remain cut off due to damaged roads and bridges, with some areas accessible only by air.

🏕️ Temporary shelter arrangements are underway
Around 450 survivors are currently staying at Shree Chandra Jyoti Secondary School. As the school prepares to resume operations, alternative temporary shelter is needed.
The Mayor of Bidur has approved a temporary tent camp on the football field beside the school, with 25 tents planned for the initial phase. MCDS is also working with UNFPA to provide medical and psychosocial support for women and children.

👕 Support for affected families continues
As of 10 September, MCDS has provided clothing assistance to 150 families, prioritising those who have lost most of their belongings.
The team is also assessing cooking needs, with an initial estimate of around 450 gas stoves required.

🙏 Needs continue to change
As the response moves forward, families are facing needs beyond immediate relief, including temporary shelter, cooking facilities, children’s education and livelihood recovery.
7979 will continue to work alongside MCDS and local partners, responding according to needs on the ground.

🙏 Please continue to pray for Nepal:
• Families who are still unable to return home
• Remote communities that remain inaccessible
• Ongoing recovery and rebuilding needs
• Wisdom, strength, safety and physical well-being for MCDS, Eddy and frontline partners

HISTEAM
7979 Major Disaster Response Management

2026-09-12

Note: Some figures and needs are based on preliminary field assessments and may be updated as further verification is carried out.

Nepal Flood 尼泊尔洪灾


  • 2026/09/17-28 尼泊尔洪灾灾难回应 · 阶段进度报告(五)Nepal Flood Disaster Response Phase Progress Report (5)
  • 2026/09/11-16 尼泊尔洪灾灾难回应 · 阶段进度报告(四)Nepal Flood Disaster Response Phase Progress Report (4)
  • 2026/09/8-10 尼泊尔洪灾灾难回应 · 阶段进度报告(三)Nepal Flood Disaster Response Phase Progress Report (3)
  • 2026/09/06-07 尼泊尔洪灾灾难回应 · 阶段进度报告(二)Nepal Flood Disaster Response Phase Progress Report (2)
  • 2026/08/26-09/05 尼泊尔洪灾灾难回应 · 阶段进度报告(一)Nepal Flood Disaster Response Phase Progress Report (1)
  • 2026/09/22 道路逐步恢复,我们也看见更多需要 As Roads Reopen, More Needs Come into View
  • 2026/09/12 从现场评估到安置行动,回应仍在继续 From Field Assessment to Temporary Shelter
  • 2026/09/07 7979前往灾区,与当地伙伴同行 7979 Heads to the Disaster-Affected Area to Serve Alongside Local Partners
  • 2026/08/30 第一阶段回应进展 Phase One Response Update
  • 2026/08/28 尼泊尔洪灾 Severe Flooding in Nepal


Holistic Integrated Services Berhad

6-G, 6-1, 8-G & 8-1 Jalan Aman Tiara 8, Bandar Tropicana Aman, Telok Panglima Garang, 42500 Kuala Langat, Selangor.

Tel: +603-9212 4664

Account No: Maybank 5-12781-01259-9 ​

  • Anti-corruption Policy
  • Anti-money Laundering Policy
  • Whistleblower Policy
  • Privacy Policy
  • Terms Of Use
  • Cancellation/Refund Policy

I Want To Donate

我要捐助



Copyrighted © 2026 by Holistic Integrated Services Bhd. Empowered by: Jet Creative Design

  • Home
    • 7979全人关怀站 7979 Holistic Care Station
    • 每月数据 ​ Monthly Statistics
    • 关于我们 About Us
  • 7979服务方案 Ministry Program
    • 急难家庭救助 Family Crisis Intervention Assistance
      • 您转化社区的伙伴
      • 让爱走动的故事 A Story Of Love In Action-CIF
    • 弱势儿童陪读 Underprivileged Children Companionship Class
      • 让爱走动的故事 A Story Of Love In Action-UPC
    • 重大灾难回应 Major Disaster Response
      • 尼泊尔洪灾 Nepal Flood
      • 儿童防减灾活动回顾 Children Disaster Preparedness & Mitigation Programme Flashback
      • 让爱走动的故事 A Story Of Love In Action-DRP
    • 吗哪食物银行 Manna Food Bank
      • 让爱走动的故事 A Story of Love in Action–MFB
    • 社区紧急援助 Community Emergency Relief
  • 7979 E-杂志 Magazine
    • September 2026
    • July 2026
    • May 2026
    • March 2026
  • 即时消息 Updates
    • 活动快讯 Events News
    • 时事议题 Current Issues
    • 媒体报道 Media Coverage
    • 活动专区 Events
      • 7979救助挑战营2025
  • 您的参与 Participation
    • 购得希望 2026
    • 陪读天使
Search