Skip to content
7979.org.my
  • HomeExpand
    • 7979全人关怀站 7979 Holistic Care Station
    • 每月数据 ​ Monthly Statistics
    • 关于我们 About Us
  • 7979服务方案 Ministry ProgramExpand
    • 急难家庭救助 Family Crisis Intervention AssistanceExpand
      • 您转化社区的伙伴
      • 让爱走动的故事 A Story Of Love In Action-CIF
    • 弱势儿童陪读 Underprivileged Children Companionship ClassExpand
      • 让爱走动的故事 A Story Of Love In Action-UPC
    • 重大灾难回应 Major Disaster ResponseExpand
      • 尼泊尔洪灾 Nepal Flood
      • 儿童防减灾活动回顾 Children Disaster Preparedness & Mitigation Programme Flashback
      • 让爱走动的故事 A Story Of Love In Action-DRP
    • 吗哪食物银行 Manna Food BankExpand
      • 让爱走动的故事 A Story of Love in Action–MFB
    • 社区紧急援助 Community Emergency Relief
  • 7979 E-杂志 MagazineExpand
    • September 2026
    • July 2026
    • May 2026
    • March 2026
  • 即时消息 UpdatesExpand
    • 活动快讯 Events News
    • 时事议题 Current Issues
    • 媒体报道 Media Coverage
    • 活动专区 EventsExpand
      • 7979救助挑战营2025
  • 您的参与 ParticipationExpand
    • 购得希望 2026
    • 陪读天使
Donate 捐助
7979.org.my
  • 中文
  • English

尼泊尔洪灾灾难回应 · 阶段进度报告(五)

30 September, 2026

一、本期概况

本期(9月17日至28日),行动重心从紧急物资发放,逐步过渡到灾后重建规划,并同步展开对教会伙伴与志工的培训工作。9月17日至18日,MCDS团队在努瓦科特与拉苏瓦多处灾区完成密集物资分发;9月21日,MCDS正式更新提交了《拉苏瓦-努瓦科特洪水泥石流紧急救援方案》(RNFLERP)重建计划与预算;9月23日,NBCC与MCDS举行联合会议,总结第一阶段成果并规划第二阶段。受尼泊尔政府9月23日发布、涵盖9月24日至27日的暴雨高度警戒影响,原订重返比杜尔(Bidur)现场的行程一度延后;9月27日至28日,7979顾问丘忠瑶(Eddy Hew)弟兄转而在加德满都的尼泊尔浸信会圣经学院,进行为期两天的灾难救援培训,反应热烈,当地教会伙伴甚至邀请他日后再回访服事三个月。

二、灾情现况(截至9月24日,尼泊尔政府数据)

根据尼泊尔政府内政部国家灾害风险降低与管理局(NDRRMA)最新通报,此次洪水泥石流灾害累计造成1,451人死亡、5,745人失踪。目前共有1,215名受灾民众安置于21个收容中心:拉苏瓦县9个中心788人、努瓦科特县8个中心306人、达丁县4个中心121人(此数字不含寄居亲友或社区家中的受灾者)。多处水电站工地的搜救工作已暂停,其余潜在灾区的搜救工作仍在进行。

政府另设立「替代住房与生计补助」,供不愿留在收容中心的家庭申请:每户(4人以内)每月NPR 15,000,超过4人者每增加1人加发NPR 2,000,最长发放六个月,相关发放机制已交由地方政府执行。

此外,尼泊尔气象部门于9月23日发布高度警戒通告,预告9月24日至27日全国多地将有大雨,可能引发土壤侵蚀、洪水、泥石流与山崩,山区并可能降雪;受此影响,MCDS原订于9月24日重返比杜尔的行程一度取消。

说明: 本节数据引自MCDS于9月24日提交之官方灾情简报(转引自政府NDRRMA通报)及政府9月23日发布之高度警戒通告,修正并补充此前报告中援引之较早期、非正式统计数字,特此说明。

三、MCDS所做

(一)灾后重建方案与预算更新

MCDS于9月21日更新了RNFLERP重建方案与预算表。方案服务期为2026年8月28日至11月30日,为期三个月,服务范围涵盖拉苏瓦(Rasuwa)、努瓦科特(Nuwakot)及达丁(Dhading)三县,预计使3,538户、约15,920位受灾居民受益(男性4,526人、女性4,889人、男童3,026人、女童3,479人)。

方案列出十项主要重建需求:500户家庭粮食包;1,600人次的心理创伤辅导培训;500户临时住所帆布/铁皮屋顶;500户纤维毛毯与床具;2,000人份卫生用品包(牙刷牙膏、肥皂、卫生棉);600户厨房用具(含瓦斯罐、瓦斯炉);100户饮用水管线修复;1,500人份男女老幼及孕妇、身心障碍者衣物;救灾队伍雨衣雨靴等装备(10人);以及900名学生的文具、书包、制服与鞋子。

按最新预算表,重建方案总预算为US$150,634,主要分配如下:

预算项目金额(美元)占比
1. 物资与直接救援项目(十项救援需求)116,98777.7%
2. 项目人力(执行长、专案人员等部分薪资)6,6674.4%
3. 交通与后勤(车辆、团队与志工差旅)14,2759.5%
4. 监督评估(跨机构追踪、SWC审批与监评费)5,9223.9%
5. 现场行政支持(会议、通讯、文具、油料、实习人力)5,3923.6%
6. 其他(稽核/应急、机构行政管理费5%)1,3920.9%
总预算(重建方案全额需求)150,634100%

目前已获承诺/预期资助的部分资金来源如下:

资助方金额(美元)状态
BWAid Australia14,000预期
APBAid5,000已确认
IM, USA10,000预期
其他资助方19,000预期
NBCC当地教会2,000预期
已获承诺/预期合计50,000

说明: 方案文件内另附一份较早版本的资金需求页,列出总需求为US$100,000,写明「尚缺US$50,000」;该页面未随9月21日的预算表同步更新。本汇报以9月21日最新版预算表数据为准,供各位了解重建方案的完整资金规模与缺口,特此说明。

(二)第一阶段救援成果总结

截至9月24日,MCDS官方简报显示,第一阶段已在努瓦科特、拉苏瓦及达丁三县、合计13个村(Ward)完成物资分发,累计服务1,850户、6,942人次受灾居民(见下表)。以下为9月17日至18日期间几处重点分发行动的现场纪录:

•  Devighat第5村Shree Chandra Joyti中学收容营:为Frontline Hearts搭建的25顶帐篷提供床具,并提供排水工具协助改善营地排水;另为全部帐篷加装防水外罩,提升耐用度。

•  贝特拉瓦蒂(Betrawati):因道路损毁,团队须绕行1,500米以上高山便道,沿途狭窄泥泞、蜿蜒危险,方能抵达。当地受灾社区因环保法规限制无法伐木取薪,处境孤立。团队分发78个瓦斯罐,另分发95户毛毯与衣物;MCDS将持续追踪评估当地后续需求。

•  曼德瑞东-比杜尔第6村(Mandredhung-Bidur):由汉诺克(Hanok)牧者带队,物资先以陆路送达,团队隔日以溜索渡河抵达社区,分发稻米予135户。

•  巴达乔达拉第5村比杜尔(Bada Choudara Ward No. 5, Bidur):获悉182个家庭陆续自多个收容中心(多数来自拉苏瓦Utta Gaya)转移至此,帐篷密集搭建,未依循「人道救援最低标准」(Sphere Standards),孩童在临近道路间嬉戏,安全堪虞。MCDS随即紧急分发64个瓦斯罐、109份撒玛利亚救援会(Samaritan Purse)物资包及滤水器。

•  Devighat第5村寄居家庭:在村官带领下,逐户探访15户寄居本地居民家中、未登记于常规收容中心的受灾家庭,发放瓦斯罐。

团队已于9月18日返回加德满都。第一阶段累计分发情况如下:

物资项目受益户数受益人数
瓦斯罐5001,946
瓦斯炉具(含调节阀、管线、打火器)242805
粮食包2601,039
衣物3951,340
防水帆布、卫生用品包4531,812
临时帐篷住所2792
合计1,8506,942


分发地区涵盖:
•  努瓦科特县:比杜尔市第5村(Devighat)、第6村(Mandredhunga)、第10村(Gorkhutar及Betrawati);贝尔科特加迪市第8村(Kushitar)
•  拉苏瓦县:乌塔尔加雅乡第1村(Khalte);阿玛乔丁莫乡第4村(Goljungbesi);戈赛昆达乡第1村(Thuman)
•  达丁县:加尔奇乡第4村(Belkhu)、第6村(Maheswar);加珠里乡第1、5、6村(Galauti、Pokhara Khola、Jaharkhet)

NBCC与MCDS表示,若条件许可,有意规划长达5年的灾后重建与社区发展方案,后续将由尼泊尔社会福利委员会(Social Welfare Council)监督并核发许可。

图中身穿红衣者为Devighat第5村的社区官员,协助逐户确认瓦斯罐发放对象(9月18日)

(三)迈向第二阶段:物资规划与心理关顾

会议中确认,后续物资将聚焦以下三类,服务对象为新纳入的受灾地区:
•  返校用品包(Back to School Kits)
•  冬季保暖包(Winter Kits)
•  女性尊严包(Women’s Dignity Kits)

其中女性尊严包部分,Eddy已取得联合国人口基金(UNFPA)提供的标准配置清单与造价(每套约NPR 3,698,内容涵盖沙丽/多蒂服、内衣物、卫生用品、个人清洁用品与手电筒等日用品);若UNFPA正式委托,MCDS可望协助执行分发。

说明: 此清单为UNFPA自身的标准配置与造价,仅供了解未来可能配合执行的项目内容,尚待正式委托确认,目前并非本系列报告所涵盖之7979资助项目,特此说明。

此外,Eddy在会议中也向NBCC/MCDS介绍了7979「雨后彩虹」心理关顾理念,期望未来能在灾后重建方案中纳入心理社会支持(psychosocial support)服务。

NBCC与Navajyoti Baptist Church合作设立的转运安置中心(Transit House/Holding Center),团队于9月23日联合会议后合影

四、7979在尼泊尔的最新行动

9月19日 – 22日
MCDS与NBCC各资深领导持续召开线上会议,就重建方案进行讨论。总干事Devanand Kadariya牧师对方案要求的态度十分严谨,Eddy表示彼此在理念上高度一致;执行长贾古(Jhaggu Prasad Gahatraj)牧师则被形容为真诚、务实可靠。Eddy亦已受邀于9月27至28日在尼泊尔浸信会圣经学院(Nepal Baptist Bible College)授课两天,参与学生可获得2学分;讨论中另提议再增设1学分,供学生实际参与救灾志工服务。此前曾参加Eddy培训课程的部分学生,已投入Bidur地区的实地救援分发工作。

9月23日 – 24日
Eddy全天制作12份培训简报(PPT),并在内容中加入教会观察与「地球健康」(Planetary Health)等主题,为即将进行的培训做准备。9月23日稍晚,NBCC与MCDS举行联合会议,检讨第一阶段成果并规划第二阶段(详见第三节)。9月24日,因暴雨高度警戒(详见第二节),原订重返比杜尔的行程延后;MCDS则利用这几天进行返校用品包的采购作业,待天气转好后于下周展开分发,当地气温也降至17-18°C。

9月27日
Eddy在尼泊尔浸信会圣经学院展开为期两天的灾难救援培训首日,进行「学校勘察」实作演练时,天公作美,雨势恰巧停歇。

汉诺克(Hanok)牧者邀请Eddy未来能再回尼泊尔服事三个月,Eddy表示将与汉诺克及贾古牧者进一步讨论细节;同日也确认已接获尼泊尔东部另一所圣经学院的培训邀约。当天课堂上还多了一位特别的「旁听生」——一只趴在教室里睡觉的狗,Eddy打趣说,这次培训「共29位学生,还不包括这只狗」。

学校勘察结果呈现
学生正在进行小组讨论
培训现场多了一位「四脚旁听生」,趴在教室一角安睡

9月28日
培训进入小组专题演练,汉诺克牧者也在课堂上分享了自己的亲身经历;培训全程以英语进行。Eddy当天计划打包家庭卫生用品包,并预备隔天再度前往比杜尔。

汉诺克牧者在课堂上分享自己的亲身经历
两天培训期间,Eddy与尼泊尔浸信会圣经学院全体学员合影

五、代祷事项

•  为所有仍在灾区工作的同工与志工的身体健康、人身安全与保护代祷;
•  为MCDS在拉苏瓦、努瓦科特及达丁三县的灾后重建方案(RNFLERP)顺利推进代祷;
•  为10月13至14日在尼泊尔举行的APBF(亚太浸信会联盟)圆桌会议代祷,届时将有伙伴机构与MCDS/NBCC代表共同与会讨论;
•  为9月24至27日的暴雨警戒期间灾区及交通安全代祷。

六、问责说明

•  地点:努瓦科特、拉苏瓦、达丁三县,合计13个村(Ward),含Devighat第5村、贝特拉瓦蒂、曼德瑞东、巴达乔达拉等重点分发现场
•  受益对象:累计1,850户、6,942人次受灾居民(第一阶段总计),含182个新转移家庭与15户寄居本地社区、未登记于常规安置点的受灾家庭
•  物资:瓦斯罐、瓦斯炉具、粮食包、衣物、防水帆布与卫生用品包、临时帐篷住所、撒玛利亚救援会物资包与滤水器(明细见上表及现场纪录)

说明: 本期汇报整理自Eddy Hew(丘忠瑶)与MCDS ,WhatsApp通讯纪录(9月17日至9月28日),以及MCDS正式提交的RNFLERP重建方案文件与9月21日更新之预算表、9月24日《MCDS灾情简报》与《拉苏瓦与努瓦科特救灾物资分发汇总》简报文件,及尼泊尔政府NDRRMA于9月23日发布之高度警戒通告(均为官方文件)。

Nepal Flood Disaster Response – Phase Progress Report (5)

30 September, 2026

1. Overview of This Reporting Period

During this reporting period (17–28 September), the focus of the response gradually shifted from emergency relief distribution to post-disaster recovery planning, while training for church partners and volunteers was carried out concurrently. From 17 to 18 September, the MCDS team completed intensive relief distribution in multiple disaster-affected areas across Nuwakot and Rasuwa. On 21 September, MCDS formally submitted an updated reconstruction plan and budget for the “Rasuwa–Nuwakot Flood and Landslide Emergency Relief Project” (RNFLERP). On 23 September, NBCC and MCDS held a joint meeting to review the outcomes of Phase One and plan for Phase Two.

Following a high-alert heavy rainfall warning issued by the Government of Nepal on 23 September, covering the period from 24 to 27 September, the originally planned return trip to Bidur was temporarily postponed. On 27–28 September, 7979 consultant Brother Eddy Hew instead conducted a two-day disaster relief training programme at the Nepal Baptist Bible College in Kathmandu. The response was very positive, and local church partners even invited him to return in the future to serve for a period of three months.

2. Current Disaster Situation (as of 24 September, based on Government of Nepal data)

According to the latest update from Nepal’s National Disaster Risk Reduction and Management Authority (NDRRMA) under the Ministry of Home Affairs, the floods and landslides have resulted in a cumulative total of 1,451 deaths and 5,745 people missing.

At present, 1,215 affected people are being accommodated in 21 shelters: 788 people in nine centres in Rasuwa District, 306 people in eight centres in Nuwakot District, and 121 people in four centres in Dhading District. These figures do not include affected people staying with relatives, friends, or within local communities.

Search and rescue operations at several hydropower construction sites have been suspended, while search and rescue efforts continue in other potentially affected areas.

The government has also introduced an “Alternative Housing and Livelihood Allowance” for families who do not wish to remain in shelters. Each household of up to four people may receive NPR 15,000 per month. For households with more than four members, an additional NPR 2,000 will be provided for each additional person. The allowance may be provided for a maximum of six months, and implementation has been delegated to local governments.

In addition, Nepal’s meteorological authorities issued a high-alert notice on 23 September, forecasting heavy rainfall across many parts of the country from 24 to 27 September. The rainfall could trigger soil erosion, floods, landslides and mudslides, while snowfall was also possible in mountainous areas. As a result, MCDS’ planned return to Bidur on 24 September was temporarily cancelled.

Note: The data in this section is taken from the official disaster situation briefing submitted by MCDS on 24 September, which cited the Government of Nepal’s NDRRMA update, as well as the government’s high-alert notice issued on 23 September. These figures revise and supplement the earlier, unofficial statistics cited in previous reports.

3. MCDS Response

(1) Updated Post-Disaster Recovery Plan and Budget
On 21 September, MCDS updated the RNFLERP recovery plan and budget. The programme period runs from 28 August to 30 November 2026, covering three months. The areas of service include the districts of Rasuwa, Nuwakot and Dhading.

The programme is expected to benefit 3,538 households, or approximately 15,920 disaster-affected residents, comprising 4,526 men, 4,889 women, 3,026 boys and 3,479 girls.

The plan identifies ten major recovery needs:
– Food packages for 500 households;
– Psychological trauma counselling training for 1,600 participants;
– Tarpaulin / corrugated metal roofing for temporary shelters for 500 households;
– Fibre blankets and bedding for 500 households;
– Hygiene kits for 2,000 people, including toothbrushes, toothpaste, soap and sanitary pads;
– Kitchen sets for 600 households, including gas cylinders and gas stoves;
– Restoration of drinking water pipelines for 100 households;
– Clothing for 1,500 people, including men, women, children, the elderly, pregnant women and persons with disabilities;
– Relief-team equipment such as raincoats and rain boots for 10 personnel; and
– Stationery, school bags, uniforms and shoes for 900 students.

According to the latest budget, the total budget for the recovery plan is US$150,634, allocated as follows:

Budget ItemAmount (US$)Percentage
1. Relief supplies and direct assistance (10 identified relief needs)116,98777.7%
2. Project personnel (partial salaries for Executive Director, project personnel, etc.)6,6674.4%
3. Transportation and logistics (vehicles, team and volunteer travel)14,2759.5%
4. Monitoring and evaluation (inter-agency follow-up, SWC approval and monitoring/evaluation fees)5,9223.9%
5. Field administrative support (meetings, communications, stationery, fuel and intern manpower)5,3923.6%
6. Others (audit/contingency and 5% organisational administration fee)1,3920.9%
Total Budget (Full Recovery Plan Requirement)150,634100%



The funding currently committed or anticipated is as follows:

DonorAmount (US$)Status
BWAid Australia14,000Anticipated
APBAid5,000Confirmed
IM, USA10,000Anticipated
Other donors19,000Anticipated
NBCClocal churches2,000Anticipated
Total Committed / Anticipated50,000

Note: The project document also contains an earlier version of the funding requirement page, which lists a total requirement of US$100,000 and states that “US$50,000 is still needed.” This page was not updated together with the budget sheet revised on 21 September. This report therefore uses the latest 21 September budget figures as the basis for presenting the full financial scale and funding gap of the recovery plan.

(2) Summary of Phase One Relief Outcomes
As of 24 September, MCDS’ official briefing reported that Phase One relief distribution had been completed across 13 wards in Nuwakot, Rasuwa and Dhading districts, cumulatively serving 1,850 households and 6,942 disaster-affected people.

The following are field records from several key distribution activities conducted between 17 and 18 September:
• Shree Chandra Jyoti Secondary School shelter camp, Ward No. 5, Devighat: Bedding was provided for the 25 tents erected by Frontline Hearts. Drainage tools were also supplied to help improve drainage conditions at the camp. Waterproof outer coverings were added to all tents to improve durability.
• Betrawati: Because of road damage, the team had to take a detour along a high-altitude mountain route of more than 1,500 metres. The road was narrow, muddy, winding and dangerous before the team could reach the affected area. The community was isolated and, due to environmental regulations, was unable to cut timber for firewood. The team distributed 78 gas cylinders, while 95 households received blankets and clothing. MCDS will continue to monitor and assess the community’s follow-up needs.
• Mandredhung–Bidur Ward No. 6: Led by Pastor Hanok, relief supplies were first transported by road. The following day, the team crossed the river by zipline to reach the community and distributed rice to 135 households.
• Bada Choudara Ward No. 5, Bidur: The team learned that 182 families had gradually relocated there from several shelters, most of them originally from Utta Gaya, Rasuwa. Tents had been densely erected without following the Sphere Standards for minimum humanitarian response, while children were playing close to nearby roads, creating significant safety concerns. MCDS immediately distributed 64 gas cylinders, 109 Samaritan’s Purse relief packages and water filters.
• Host families in Ward No. 5, Devighat: Accompanied by local ward officials, the team visited 15 disaster-affected families who were staying in local residents’ homes and were not registered in regular evacuation shelters. Gas cylinders were distributed to these families.

The team returned to Kathmandu on 18 September.

The cumulative distribution results for Phase One are as follows:

Relief ItemBeneficiary HouseholdsBeneficiaries
Gas cylinders5001,946
Gas stove sets, including regulators, hoses and igniters242805
Food packages2601,039
Clothing3951,340
Waterproof tarpaulins and hygiene kits4531,812
Temporary tent shelters2792
Total1,8506,942


Distribution areas included:
• Nuwakot District: Bidur Municipality Ward No. 5 (Devighat), Ward No. 6 (Mandredhunga), Ward No. 10 (Gorkhutar and Betrawati); Belkotgadhi Municipality Ward No. 8 (Kushitar)
• Rasuwa District: Uttargaya Rural Municipality Ward No. 1 (Khalte); Amachhodingmo Rural Municipality Ward No. 4 (Goljungbesi); Gosaikunda Rural Municipality Ward No. 1 (Thuman)
• Dhading District: Galchhi Rural Municipality Ward No. 4 (Belkhu), Ward No. 6 (Maheswar); Gajuri Rural Municipality Wards No. 1, 5 and 6 (Galauti, Pokhara Khola and Jaharkhet)

NBCC and MCDS have indicated that, subject to conditions, they intend to explore a post-disaster recovery and community development programme lasting up to five years. The programme would subsequently be supervised and approved by Nepal’s Social Welfare Council.

The man in red is a community official from Devighat Ward No. 5, assisting with door-to-door verification of recipients for the gas cylinder distribution. (18 September)

(3) Moving into Phase Two: Relief Supplies Planning and Psychosocial Care

During the meeting, it was confirmed that the next phase of relief supplies would focus on the following three categories, targeting newly included disaster-affected areas:
• Back to School Kits
• Winter Kits
• Women’s Dignity Kits

For the Women’s Dignity Kits, Eddy has obtained the standard contents list and costing provided by the United Nations Population Fund (UNFPA). Each kit costs approximately NPR 3,698 and includes daily necessities such as sari/dhoti clothing, undergarments, sanitary products, personal hygiene items and a flashlight. If formally commissioned by UNFPA, MCDS may assist in carrying out the distribution.

Note: This list reflects UNFPA’s own standard kit contents and costing, and is provided only for reference regarding a possible future area of collaboration. Formal commissioning has yet to be confirmed, and this is currently not a 7979-funded project covered under this series of reports.

In addition, during the meeting, Eddy introduced MCDS to 7979’s “Rainbow After the Rain” psychosocial care concept, with the hope that psychosocial support services may be incorporated into future post-disaster recovery programmes.

The Transit House / Holding Center jointly established by NBCC and Navajyoti Baptist Church. The team took a group photo after a joint meeting on 23 September.

4. Latest 7979 Actions in Nepal

19–22 September
Senior leaders from MCDS and NBCC continued to hold online meetings to discuss the recovery plan. Rev. Devanand Kadariya, General Secretary, took a rigorous approach towards the requirements of the plan, and Eddy noted that they were highly aligned in their overall understanding and approach. Executive Director Rev. Jhaggu Prasad Gahatraj was described as sincere, practical and dependable.

Eddy was also invited to teach a two-day course at Nepal Baptist Bible College on 27–28 September. Participating students would receive two academic credits. During discussions, a proposal was also raised to add one additional credit for students who take part in practical disaster relief volunteer service. Some students who had previously attended Eddy’s training had already participated in field relief distribution work in the Bidur area.

23–24 September
Eddy spent the entire day preparing 12 training presentation decks (PPTs), incorporating topics such as church observation and “Planetary Health” in preparation for the upcoming training.

Later on 23 September, NBCC and MCDS held a joint meeting to review the outcomes of Phase One and plan for Phase Two, as detailed in Section 3.

On 24 September, due to the high-alert heavy rainfall warning described in Section 2, the originally planned return trip to Bidur was postponed. MCDS used the intervening days to procure Back to School Kits, with distribution scheduled to begin the following week once weather conditions improved. Local temperatures had also dropped to approximately 17–18°C.

27 September
Eddy began the first day of a two-day disaster relief training programme at Nepal Baptist Bible College. During a practical “school assessment” exercise, the weather was favourable and the rain happened to stop.

Pastor Hanok invited Eddy to return to Nepal in the future to serve for a period of three months. Eddy indicated that he would further discuss the details with Pastor Hanok and Rev. Jhaggu. On the same day, it was also confirmed that Eddy had received an invitation to conduct training at another Bible college in eastern Nepal.

There was also one unusual “observer” in the classroom that day — a dog sleeping inside the classroom. Eddy jokingly remarked that there were “29 students in the training, not including the dog.”

Presentation of the school assessment findings
Students taking part in a group discussion
A four-legged “observer” joined the training session, sleeping peacefully in a corner of the classroom

28 September
The training moved into small-group thematic exercises, during which Pastor Hanok also shared his personal experience. The entire training programme was conducted in English.

That day, Eddy planned to pack family hygiene kits and prepare to travel once again to Bidur the following day.

Pastor Hanok shared his personal experience during the session
Eddy with all the students of Nepal Baptist Bible College during the two-day training

5. Prayer Items

• Pray for the health, personal safety and protection of all staff members and volunteers who are still working in the disaster-affected areas;
• Pray for the smooth implementation of MCDS’ post-disaster recovery programme, RNFLERP, in Rasuwa, Nuwakot and Dhading districts;
• Pray for the APBF (Asia Pacific Baptist Federation) Roundtable Meeting to be held in Nepal on 13–14 October, where partner organisations and representatives from MCDS/NBCC will meet for discussions;
• Pray for the safety of disaster-affected areas and transportation routes during the heavy rainfall alert period from 24 to 27 September.

6. Accountability Information

• Locations: A total of 13 wards across Nuwakot, Rasuwa and Dhading districts, including key distribution sites such as Devighat Ward No. 5, Betrawati, Mandredhung and Bada Choudara
• Beneficiaries: A cumulative total of 1,850 households and 6,942 disaster-affected people served during Phase One, including 182 newly relocated families and 15 affected families staying within local communities who were not registered at regular shelters
• Relief Supplies: Gas cylinders, gas stove sets, food packages, clothing, waterproof tarpaulins and hygiene kits, temporary tent shelters, Samaritan’s Purse relief packages and water filters (see the table and field records above for details)

Note: This reporting period was compiled from WhatsApp communication records between Eddy Hew and MCDS from 17 to 28 September, together with the formally submitted MCDS RNFLERP recovery plan, the updated budget dated 21 September, the “MCDS Disaster Situation Briefing” dated 24 September, the “Summary of Relief Supplies Distribution in Rasuwa and Nuwakot” briefing document, and the high-alert notice issued by the Government of Nepal’s NDRRMA on 23 September. All of these are official documents.

Nepal Flood 尼泊尔洪灾


  • 2026/09/17-28 尼泊尔洪灾灾难回应 · 阶段进度报告(五)Nepal Flood Disaster Response Phase Progress Report (5)
  • 2026/09/11-16 尼泊尔洪灾灾难回应 · 阶段进度报告(四)Nepal Flood Disaster Response Phase Progress Report (4)
  • 2026/09/8-10 尼泊尔洪灾灾难回应 · 阶段进度报告(三)Nepal Flood Disaster Response Phase Progress Report (3)
  • 2026/09/06-07 尼泊尔洪灾灾难回应 · 阶段进度报告(二)Nepal Flood Disaster Response Phase Progress Report (2)
  • 2026/08/26-09/05 尼泊尔洪灾灾难回应 · 阶段进度报告(一)Nepal Flood Disaster Response Phase Progress Report (1)
  • 2026/09/22 道路逐步恢复,我们也看见更多需要 As Roads Reopen, More Needs Come into View
  • 2026/09/12 从现场评估到安置行动,回应仍在继续 From Field Assessment to Temporary Shelter
  • 2026/09/07 7979前往灾区,与当地伙伴同行 7979 Heads to the Disaster-Affected Area to Serve Alongside Local Partners
  • 2026/08/30 第一阶段回应进展 Phase One Response Update
  • 2026/08/28 尼泊尔洪灾 Severe Flooding in Nepal


Holistic Integrated Services Berhad

6-G, 6-1, 8-G & 8-1 Jalan Aman Tiara 8, Bandar Tropicana Aman, Telok Panglima Garang, 42500 Kuala Langat, Selangor.

Tel: +603-9212 4664

Account No: Maybank 5-12781-01259-9 ​

  • Anti-corruption Policy
  • Anti-money Laundering Policy
  • Whistleblower Policy
  • Privacy Policy
  • Terms Of Use
  • Cancellation/Refund Policy

I Want To Donate

我要捐助



Copyrighted © 2026 by Holistic Integrated Services Bhd. Empowered by: Jet Creative Design

  • Home
    • 7979全人关怀站 7979 Holistic Care Station
    • 每月数据 ​ Monthly Statistics
    • 关于我们 About Us
  • 7979服务方案 Ministry Program
    • 急难家庭救助 Family Crisis Intervention Assistance
      • 您转化社区的伙伴
      • 让爱走动的故事 A Story Of Love In Action-CIF
    • 弱势儿童陪读 Underprivileged Children Companionship Class
      • 让爱走动的故事 A Story Of Love In Action-UPC
    • 重大灾难回应 Major Disaster Response
      • 尼泊尔洪灾 Nepal Flood
      • 儿童防减灾活动回顾 Children Disaster Preparedness & Mitigation Programme Flashback
      • 让爱走动的故事 A Story Of Love In Action-DRP
    • 吗哪食物银行 Manna Food Bank
      • 让爱走动的故事 A Story of Love in Action–MFB
    • 社区紧急援助 Community Emergency Relief
  • 7979 E-杂志 Magazine
    • September 2026
    • July 2026
    • May 2026
    • March 2026
  • 即时消息 Updates
    • 活动快讯 Events News
    • 时事议题 Current Issues
    • 媒体报道 Media Coverage
    • 活动专区 Events
      • 7979救助挑战营2025
  • 您的参与 Participation
    • 购得希望 2026
    • 陪读天使
Search